- 冷庫(kù)安裝的流程是怎么樣的,有哪些步驟?
- 本站編輯:杭州克冷制冷設(shè)備有限公司發(fā)布日期:2021-06-23 19:32 瀏覽次數(shù):
相信很多想要安裝冷庫(kù)的公司對(duì)于冷庫(kù)是怎么安裝的充滿好奇。那么今天杭州了克冷制冷的周工程師就帶大家了解一下,冷庫(kù)安裝的流程是怎么樣的?有哪些步驟?今天小編就給大家普及一下知識(shí)。首先想說(shuō)的是冷庫(kù)安裝是一個(gè)系統(tǒng)工程,主要分為冷庫(kù)庫(kù)板安裝、冷風(fēng)機(jī)安裝、制冷機(jī)組安裝、制冷管道安裝、電控系統(tǒng)安裝、調(diào)試這幾個(gè)部分。這樣說(shuō)的話,可能很多人都不明白是什麼意思,那么以下再詳細(xì)一點(diǎn)。
I believe that many companies who want to install cold storage are curious about how to install cold storage. So today, Hangzhou gram cold refrigeration engineer Zhou will take you to know about the cold storage installation process is how? What are the steps? Today Xiaobian will give you the knowledge to popularize. First of all, I want to say that the installation of cold storage is a system engineering, which is mainly divided into the installation of cold storage board, the installation of air cooler, the installation of refrigeration unit, the installation of refrigeration pipeline, the installation of electric control system and the commissioning of these parts. Said so, probably a lot of people do not understand what is the meaning, then the following more detailed
1. 冷庫(kù)設(shè)計(jì)的方案。一般是根據(jù)客戶的需求,冷庫(kù)建造廠家派工程師或技術(shù)同事和客戶詳細(xì)溝通后,現(xiàn)場(chǎng)確認(rèn)后設(shè)計(jì)出合理的方案,其中包括:制冷系統(tǒng)的確定、庫(kù)房布局、材料、設(shè)備、配件的合理配置、電控、溫控的配置等等。
1. Cold storage design scheme. Generally, according to the needs of customers, the cold storage manufacturer sends engineers or technical colleagues to communicate with customers in detail, and designs reasonable schemes after on-site confirmation, including: the determination of refrigeration system, the layout of the warehouse, the reasonable configuration of materials, equipment and accessories, the configuration of electric control and temperature control, and so on.
2. 冷庫(kù)冷風(fēng)機(jī)的安裝:冷風(fēng)機(jī)的安裝位置最好在空氣循環(huán)最好的位置。冷風(fēng)機(jī)應(yīng)該與庫(kù)板之間保持一定的距離,一般要大于冷風(fēng)機(jī)的厚度,例如冷風(fēng)機(jī)厚度為 0.5m則冷風(fēng)機(jī)與庫(kù)板之間最小距離必須超過(guò)0.5m方可。
2. Installation of cold storage air cooler: the installation location of the air cooler is best in the best position of air circulation. A certain distance should be maintained between the air cooler and the library plate, which is generally greater than the thickness of the air cooler. For example, the thickness of the air cooler is 0.5m, the minimum distance between the air cooler and the library plate must exceed 0.5m.
3. 冷庫(kù)制冷機(jī)組安裝:一般小型冷庫(kù)都安裝全封閉式制冷機(jī)組,而中大型冷庫(kù)則安裝半封閉制冷機(jī)組。在制冷機(jī)組安裝結(jié)束后需要安裝配套的油分離器,并加入適量機(jī)油,如果冷庫(kù)預(yù)設(shè)溫度低于零下15℃的話還應(yīng)該加入冷凍機(jī)油。
3 cold storage refrigeration unit installation: general small cold storage are installed with fully closed refrigeration unit, and medium and large cold storage is installed with semi-closed refrigeration unit. After the installation of the refrigeration unit, the supporting oil separator needs to be installed, and the right amount of oil should be added. If the preset temperature of the cold storage is lower than minus 15℃, the refrigerating oil should also be added.
4. 冷庫(kù)管道的安裝:管道直徑必須滿足冷庫(kù)設(shè)計(jì)使用要求,并且與各個(gè)設(shè)備之間保持一定的安全距離,安裝位置也需要根據(jù)現(xiàn)場(chǎng)實(shí)際情況進(jìn)行調(diào)整。
4. Installation of cold storage pipeline: the diameter of the pipeline must meet the design and use requirements of cold storage, and maintain a certain safe distance from each equipment, and the installation position needs to be adjusted according to the actual situation on the site.
5. 冷庫(kù)電控制系統(tǒng)的安裝:在各個(gè)連接點(diǎn)處都必須進(jìn)行標(biāo)記,方便日后維修、檢測(cè);所以電線必須用綁線進(jìn)行固定;做好防潮工作,防止電線進(jìn)水導(dǎo)致短路。
5. Installation of the electric control system of the cold storage: all the connection points must be marked to facilitate future maintenance and detection; So the wire must be fixed with a tie wire; Do moisture-proof work to prevent short circuit caused by water in wires.
6. 冷庫(kù)的調(diào)試工作:冷庫(kù)調(diào)試時(shí)需要先對(duì)電源電壓進(jìn)行確認(rèn)是否正常,很多情況下用戶來(lái)電報(bào)修,都是因?yàn)楫?dāng)時(shí)電壓不穩(wěn)不能正常啟動(dòng)冷庫(kù)所引起的,然后檢查設(shè)備的開(kāi) 閉情況,向儲(chǔ)液罐內(nèi)注入制冷劑,然后運(yùn)行壓縮機(jī)。
6 cold storage debugging work: cold storage debugging needs to confirm whether the power supply voltage is normal. In many cases, the user calls for repair because the voltage is unstable and the cold storage cannot be started normally. Then check the opening and closing of the equipment, inject refrigerant into the liquid storage tank, and then run the compressor.
7,售后的維護(hù)。冷庫(kù)制作完成后不是一勞永逸的持續(xù)使用的,還需要定期的保養(yǎng)與檢修。對(duì)于電路老化,密封不嚴(yán),系統(tǒng)異常等問(wèn)題要及時(shí)發(fā)現(xiàn)并做出維護(hù),以保證冷庫(kù)使用的安全性。
7. After-sales maintenance. Cold storage production is not sustainable use once and for all, but also need regular maintenance and repair. For circuit aging, lax sealing, abnormal system and other problems should be found and maintained in time to ensure the safety of the use of cold storage.
關(guān)于冷庫(kù)安裝有很多是需要長(zhǎng)期從業(yè)的經(jīng)驗(yàn)才能做的完善的,如果朋友們對(duì)于以上內(nèi)容還有不懂的地方可以隨時(shí)來(lái)咨詢我們克冷制冷,我們會(huì)詳細(xì)為大家解答的。杭州克冷制冷致力于食品冷庫(kù)、藥品冷庫(kù)、商超冷庫(kù)、冷風(fēng)柜、負(fù)壓風(fēng)機(jī)等系列產(chǎn)品,憑借優(yōu)異的實(shí)用性和節(jié)能效果,贏得了眾多客戶的青睞。歡迎您的咨詢合作。聯(lián)系電話 :13116798338(祝經(jīng)理 )